Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Nov 03, 2023     Ammeter shunt and throttle cable - (2 hours)       Category: Avionics
Messed with a location for the ammeter shunt and decided the best place would be lower right on the firewall. Removed the throttle cable and drilled the cover plate for a cable pass thru. Made a rudimentary template and used a fuel line to verify Vans location for the hole would work for my cable. Needed to split the called out snap bushings (-6) to make them able to pass over the cable threads. Gonna be a miracle if I can assemble it all back together in the correct order


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.